In the building and construction industry, time and efficiency are paramount. Understanding the nuances of planning permission can significantly impact project timelines and client satisfaction. Fortunately, a range of exemptions allows certain developments to proceed without the need for formal planning permission. Builders, armed with this knowledge, can provide invaluable advice to their clients, ensuring smoother and faster project execution. This guide will explore these exemptions and how builders can leverage them to benefit their clients, with a focus on the essential Section 5 Declaration.

Key Exemptions for Builders to Advise On
1. House Extensions, Renovations, and Sheds
Extensions:
Size Limits: Extensions can add up to 40 square metres to a house without planning permission. This is reduced for terraced or semi-detached houses.
Height Restrictions: Extensions must not be taller than the existing house and should not be built forward of the house's original front line.
Previous Extensions: Consider the total floor space added by previous extensions when calculating the 40 square metre limit.
Advice to Clients: Highlight that adhering to these guidelines can expedite the process and reduce paperwork. Ensure accurate measurements and compliance with height and positioning rules.
Renovations:
Internal Modifications: These are generally exempt unless they alter the house's external appearance or structure.
Repairs: Routine repairs that do not change the house's exterior are typically exempt.
Advice to Clients: Encourage clients to focus on internal renovations if they want to avoid
planning permission and highlight the benefits of keeping the external appearance unchanged for simpler approval.
Sheds and Ancillary Buildings:
Floor Area: Structures up to 25 square metres are usually exempt.
Height: Must be under 4 metres (pitched roofs) or 3 metres (flat roofs).
Location: Must leave at least 25 square metres of open space in the garden or yard.
Usage: Cannot be used for living purposes or for specific animal housing.
Advice to Clients: Recommend optimizing the placement and use of sheds or garages within these limits to avoid permission requirements. Ensure clients understand the importance of intended use and location.
2. Velux Windows
Rear Roof Installation: Velux windows installed on the rear roof are generally exempt.
Non-Protrusion: They must be flush with the roof or not extend beyond the existing roof plane.
Light and Privacy: Ensure that the installation does not impact the light or privacy of neighboring properties.
Advice to Clients: Emphasize the benefits of rear roof installations for a smoother approval process and advise on designs that minimize visual impact from public viewpoints.
3. Agricultural Buildings
Livestock Structures:
Floor Area: Structures for housing livestock up to 200 square metres are typically exempt.
Cumulative Area: Total floor space of all such buildings within the farmyard should not exceed 300 square metres.
Poultry, Pigs, and Mink Housing:
Floor Area: Structures up to 75 square metres are exempt.
Agricultural Storage Buildings:
Usage: For storing produce, fodder, or machinery. Not for storing slurry or effluents.
Glasshouses:
Location: Must be on agricultural land and used for cultivation purposes.
Advice to Clients: Guide clients on strategically placing agricultural buildings to utilize these exemptions effectively. Emphasize compliance with size limits and environmental regulations.
4. Apartments
Limited Exemptions:
New Developments: Always require planning permission.
Extensions/Modifications: Significant changes typically need approval.
Change of Use: Converting buildings to or from apartment use generally requires planning permission.
Minor Works:
Internal Alterations: Exempt if they don't affect external appearance.
Maintenance and Repairs: Routine maintenance is exempt unless it significantly alters the building.
Advice to Clients: For apartment projects, stress the importance of full compliance with planning regulations. Minor internal changes can proceed without permission, but significant modifications should be carefully planned to meet regulatory requirements.
Navigating the Exemption Process for Clients
1. Detailed Review
Ensure a thorough review of specific conditions for each exemption category to confirm compliance.
2. Consultation
Offer consultations to clients to assess their project's scope and potential exemptions. Your expertise can provide clarity and direction, especially for complex or borderline cases.
3. Section 5 Declaration
For projects with uncertain exemption status, recommend applying for a Section 5 declaration. This will provide definitive guidance and avoid potential legal issues.
Understanding Exemptions from Planning Permission
The Role of Section 5 Declaration
Section 5 of the Planning and Development Act provides a mechanism for obtaining official confirmation on whether a proposed development requires planning permission. Here's how builders can use this tool to advise their clients:
Purpose: It clarifies if planning permission is needed for a project, providing legal certainty.
Process: Builders can assist clients in submitting a detailed request to the local planning authority.
Decision Timeline: The authority responds within four weeks, ensuring timely decisions.
Outcome: The declaration confirms whether the development is exempt, allowing the project to proceed without delays.
Conclusion
Builders who understand and leverage planning permission exemptions can deliver projects more efficiently and provide valuable guidance to their clients. Whether advising on house extensions, agricultural buildings, or minor renovations, knowing the rules and using tools like the Section 5 Declaration can streamline the process, saving time and resources.
By staying informed and proactive, builders can ensure compliance, reduce bureaucratic hurdles, and enhance client satisfaction. Always aim to provide clear, actionable advice that aligns with planning regulations and maximizes project success.